PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued grouting base plates Pic -1 (800x600).jpg Continued grouting base plates Pic -2 (800x600).jpg Excavation for a manhole at Rahway Ave. Facing South side of the Court Building (800x600).jpg Excavation in front of the Court Building (South Side) (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. Facing South side of the Court Building (800x600).jpg
Next page Continued grouting base plates Pic -1 (800x600)
Continued grouting base plates Pic -1 (800x600)